Harder helped build a new specialty care facility to rehabilitate patients with complex health conditions. The project scope included installing all plumbing, medical gases, vacuum piping, and equipment throughout the hospital care rooms, restroom facilities, and labs.
Project Breakdown
Budget
$1.2
Million
Location
Surprise
AZ
Project Summary
Arizona Healthcare Facility
The Cobalt Rehabilitation Hospital provides a wide range of rehabilitation services for patients who have suffered from stroke, trauma, hip fracture, and brain injuries. The upscale, 40-bed hospital also features many hotel-like amenities.
Harder provided the installation of all plumbing, waste and vent, medical air, oxygen, vacuum piping, fixtures, and equipment for the new two-story, 55,000 SF facility. Additional scope included modularization of restroom waste and vent systems as well as prefabrication assemblies for mechanical chases and racks.
Harder prefabricated the modules in our Phoenix, AZ fabrication facility and delivered them to site for installation.
No two projects are ever the same. At Harder, we approach each project individually, tailoring our approach to meet the needs of our client. But we bring our past experiences to the table to make sure we are always providing the best-in-class service our clients expect.